It's the new Expo 2030 station on the Riyadh Metro Yellow Line, which runs to the airport. The numbers: - A steel dome 134 m across, 39 m above King Salman Road - 8 branching columns inspired by the local acacia (talh) tree - About 70,000 m² in total, 44,000 m² of it green space - Up to 19,000 passengers an hour - Solar panels for about a quarter of its energy Why tree columns? Each column splits into branches that hold the roof at many points, so the roof steel only bridges short gaps and can stay light—fewer columns on the ground, a lot more shade above, which matters in Riyadh heat. It stays part of the metro after the Expo ends. Would you wait for a train under this? The photos are illustrations, not the real station.




Save this before you tile: 1. Build it into a 225 mm (9-inch) wall with a lintel over the opening. A 150 mm wall leaves too little behind it 2. Make the back solid concrete, not a cut hollow block 3. Slope the shelf towards the shower, about 3 mm over its depth, so water runs out 4. Tape every inside corner, then waterproof every face in 2 coats, lapped onto the wall's waterproofing 5. Flood-test it before tiling 6. Tile every face, trim the edges, and size it to whole tiles 7. Put it on a wall out of the direct spray


People who skipped this layer later realize how cheap and easy it was yet chose to ignore it will dwell in lifelong regret.


That white powder and peeling paint is rising damp. Water in the ground climbs the blocks like a sponge, and it leaves salt behind as it dries. This is the Nigerian way to stop it, built in on day one: 1. Substructure blocks on the strip foundation, filled solid with concrete, with a bitumen coat where they touch the soil. 2. Hardcore and sand blinding inside, then a DPM (polythene sheet) on the blinding, turned up at the slab edge. 3. The oversite slab cast right over the substructure wall to its outer face. 4. A DPC strip on the slab under the first course, lapped with the DPM, and the superstructure wall starts on it. 5. Slab and DPC at least 150 mm above the outside ground, the same 150 mm rule as UK Approved Document C. 6. Render that stops just above the DPC on a small bellcast, and outside paving that falls away from the wall. Raising the compound with fresh sand or interlock after the house is built is how a lot of good DPCs get buried. Sources: gov.uk/government/publicatio… specifiedby.com/building-reg… designingbuildings.co.uk/wik…

1. Self-clinging climbers, straight on the wall 2. Climbers on wires or a trellis, with an air gap behind 3. Planter boxes along every balcony 4. Modular living wall panels 5. Stepped terraces with trailing plants 6. A free-standing green screen in front of the wall Climbers rooted in the ground or in planters grow up the wall or its frame. A living wall holds the plants in panels, so it needs a water line and more care. Which one would you put on your house?

Most of us grew up believing Iran is just a barren, suffering, dry desert. That's how media propaganda painted it to be. Yet Tehran has tree-lined streets, parks, and greenery. Valiasr Avenue alone is famous for it. And this is in a semi-arid place where rain is low, so they actually have to plant those trees on purpose and water them. Now contrast that with tropical African cities: Nairobi, Lagos, Accra, Douala, Kampala, Dakar. We are sitting in regions that should be super fertile and lush by nature. But look at our urban centres... concrete everywhere, little to no street trees, very little greenery. Rapid urbanization, informal settlements, and weak planning have stripped away the vegetation our climate would have given us for free. So the country they call a desert is greener than the continent they call the tropics? The irony writes itself.



There is no free plot here. Both will cost you. A, the rock plot: 1. Rock is one of the strongest bases you can build on, so no deep foundations 2. It never floods and the house stays dry 3. But breaking and removing granite is slow, noisy and expensive 4. Balanced boulders must be made safe before anyone works near them 5. Pipes, septic tanks and drainage have to be cut into the rock B, the swamp plot: 1. It is flat and easy to work, with no rock to break 2. Water is never far away 3. But it needs tonnes of sand fill and time for it to settle 4. Foundations go deeper, often onto piles or a raft 5. Without proper drainage and a raised floor, damp and flooding follow you for years The smart move is to design for the site, not fight it. On A, build around the rock and make it the feature. On B, raise the house and let the water have somewhere to go. Which one did you pick, and why?