←
BITMAIN2,599 posts
BITMAIN avatar

BITMAIN

@BITMAINtech

The world's leading manufacturer of digital currency servers through its brand ANTMINER.

◷ Joined November 2013▧ 1,156 Photos and videos
BITMAIN avatar
BITMAIN@BITMAINtech·Aug 28

🎤 WDMS Global 2026 — Official Launch 💡 BITMAIN has officially launched the latest-generation hydro-cooling miner — the ANTMINER S23 XP Hyd. at WDMS Global 2026, under the slogan "Revolutionizing Hydro-cooling Once Again," setting a new industry benchmark once again. ⚡ The S23 XP Hyd. achieves an energy efficiency as low as 8.9 J/T with a total hashrate of up to 600T, delivering further improvements in energy efficiency and operational stability — marking a new stage in BITMAIN's hydro-cooling technology and providing a more efficient and sustainable solution for large-scale data center deployment. 📅 Shipping is expected from November 2026 to January 2027. 🎫 Pricing and full specifications: shop.bitmain.com/product/det… 🚀 Ride the Cycle. Hydro Prevails. #BITMAIN #ANTMINER #WDMS #WDMS2026 #HongKong

Post attachment
BITMAIN avatar
BITMAIN@BITMAINtech·Nov 16

🚀 BITMAIN heads to the 17th Blockchain Life Forum in Dubai! 📍 Booth A7 | Dec 1-2 | Festival Arena New products on display: 🔹 ANTMINER S23 XP Hyd. 🔹 ANTMINER S23e U2H 🔹 ANTMINER Z15 Pro 🔹 ANTRACK AR21 🔹 ACS (ANTCOLDSTORAGE) 🔒 + a surprise product — stay tuned! Join 15,000+ attendees from 130+ countries! 🎟️ Use promo code "BITMAIN" for a 10% discount on tickets! #BITMAIN #ANTMINER #BlockchainLife

Post attachment
BITMAIN avatar
BITMAIN@BITMAINtech·Nov 13

⏰Limited-Time Return: ANTRACK AR1901 & AR1902 👏Thank you for your continued support — AR1903 and AR1904 are sold out. To give back to our customers, the AR1901 and AR1902 Hydro-Cooling Packages return for a limited time: ANTMINER S19 XP+ Hyd. computing servers inside each package at a special price of $1/T. Limited stock, while supplies last. 💦ANTRACK AR1901 Hydro-Cooling Package ANTRACK AR1901 = ANTRACK AR21 + 4× ANTMINER S19 XP+ Hyd. Total hashrate 1,172 TH/s | Total power consumption 24 kW | Leaving water temperature up to 50 °C ANTRACK AR21 at $2,888 per set + 4× ANTMINER S19 XP+ Hyd. at $1/T = $4,060 per package. 💦ANTRACK AR1902 Hydro-Cooling Package ANTRACK AR1902 = ANTRACK AR22 + 4× ANTMINER S19 XP+ Hyd. Total hashrate 1,172 TH/s | Total power consumption 32 kW | Leaving water temperature up to 80 °C for high-temperature hot water ANTRACK AR22 at $8,888 per set + 4× ANTMINER S19 XP+ Hyd. at $1/T = $10,060 per package. ⛏️Computing and heat recovery run in parallel — one investment, two outputs.* * Power figures are based on manufacturer-rated specifications. Actual operating costs depend on your local electricity rates, facility conditions and operational practices and may vary. Heat recovery output depends on site conditions and ambient temperature. No guarantee of returns is made. Sales start: November 13, 2026 Shipping: within 20 business days after payment antrack@bitmain.com | bitmain.com BITMAIN remains committed to consistently delivering better products and services to its clients.

Post attachmentPost attachment
BITMAIN avatar
BITMAIN@BITMAINtech·Nov 2

ACS Cold Storage Solution: Cooling That No Longer Consumes Water 💧In hot, water-scarce, and high-water-cost regions, evaporative cooling depends on continuous make-up water, making water costs and usage quotas a real constraint on data center siting and operations. From water-demand reduction targets in the UAE and Saudi Arabia to tightened groundwater permitting in Arizona, water policies across the world's hot regions are steadily tightening. 🧊The ACS (ANT COLD STORAGE) cold storage solution uses a closed-loop design—no water is consumed during normal operation and no continuous make-up is required—shifting cooling from "constant water use" to "cooling stored in advance". ❄️In a full-year reference calculation for a 1 MW load, a conventional evaporative pad system consumes about 8,000 tons of water per year and a wet cooling tower about 9,000 tons, while the ACS-based solution requires zero make-up water. Each unit stores approximately 8 GJ of cooling capacity and provides about 6 hours of supplemental cooling for a 2 MW hydro-cooling container during peak hot hours. According to reference estimates, the investment pays back in roughly 2 years, depending on site climate, electricity, and water prices. 📒Note: Policy references are drawn from public government sources (UAE Water Security Strategy 2036, Saudi Qatrah program, Arizona Department of Water Resources announcements, etc.). Payback is an internal reference estimate and actual results vary with site conditions; not a guarantee of returns. BITMAIN remains committed to consistently delivering better products and services to its clients. #BITMAIN #ANTCOLDSTORAGE #ACS #ColdStorage #DataCenter #WaterSaving

Post attachmentPost attachment
2:21
BITMAIN avatar
BITMAIN@BITMAINtech·Oct 30

📡 BITMAIN has released the MFspec V3 Hydro-cooling Data Center Construction Solution — an in-depth guide for building efficient hydro-cooling data centers worldwide. 🌍 Covering five key sections — site selection, design, cost estimation, construction, and acceptance — the Solution leverages a standardized, modular approach designed to help you shorten construction cycles and reduce project costs, enabling you to deploy with confidence. 🏗️ Key highlights: 🔹 ANTSPACE HW7 modular design solution 🔹 Designed for diverse environments: -40°C to 50°C 🌡️ 🔹 Full guidance from power systems to fire safety 🔧 📖 Read the full guide: bitmain.com/miningFarmConstr… Contact: mfspec@bitmain.com BITMAIN remains committed to consistently delivering better products and services to its clients. #BITMAIN #ANTSPACE #HydroCooling #DataCenter #MFspec

3:29
BITMAIN avatar
BITMAIN@BITMAINtech·Oct 14

❄️ACS (ANT COLD STORAGE) is a containerized cold-storage and supplemental cooling solution from BITMAIN, designed for mining farms and liquid-cooling data centers in hot, water-constrained, and high-water-cost regions. The system integrates chillers, an approximately 48m³ cold-storage water tank, pumps, and control systems to store cooling in advance and release it during peak hot hours, providing supplemental cooling to the load side. 💦ACS uses a closed water loop and consumes no water during normal operation, reducing reliance on evaporative water pads and continuous make-up water. This helps customers improve deployment flexibility in areas where water resources are limited. With approximately 8GJ of stored cooling capacity, one ACS unit can provide about six hours of supplemental cooling for a 2MW hydro-cooling container under reference conditions, helping ease peak cooling pressure during hot hours. ⛏️For mining farms, ACS can work with ANTSPACE HW7, HD5, and HK3 hydro-cooling containers to help reduce operating risks during peak heat. For liquid-cooling data centers, ACS can be integrated as a cold-storage and peak-cooling module, easing cooling equipment and power distribution pressure while supporting stable system operation. 🔋Store Cooling Before the Heat. Release It When It Matters. BITMAIN remains committed to consistently delivering better products and services to its clients. #BITMAIN #ANTCOLDSTORAGE #ACS #ColdStorage #DataCenter #HydroCooling

Post attachmentPost attachment
BITMAIN avatar
BITMAIN@BITMAINtech·Oct 13

Meet BITMAIN at Kleinwasserkraft Österreich 2026! Booth M30 | Montforthaus Feldkirch, Vorarlberg October 15-16 Visit our booth and discover our latest hydro-cooling solutions for small hydropower applications. We look forward to seeing you there. #BITMAIN #Kleinwasserkraft #Hydropower #Austria

Post attachment
BITMAIN avatar
BITMAIN@BITMAINtech·Oct 12

⚡ ANTSPACE HW7 : 2MW Dry Tower + Evaporative Cooling Pad ✅ ≤5°C precision supply-to-ambient temperature control ✅ −40~50°C wide-range operational reliability ✅ 242 2U-type (S23e U2H) / 396 T-type Miners ✅ PUE 1.03 · 10-year design life ✅ North America & CE certified #BITMAIN #HW7 #HydroCooling

2:45
BITMAIN avatar
BITMAIN@BITMAINtech·Oct 12

⚡ ANTSPACE HW7 : 2MW Dry Tower + Evaporative Cooling Pad ✅ ≤5°C precision supply-to-ambient temperature control ✅ −40~50°C wide-range operational reliability ✅ 242 2U-type (S23e U2H) / 396 T-type Miners ✅ PUE 1.03 · 10-year design life ✅ North America & CE certified #BITMAIN #HW7 #HydroCooling

2:45
BITMAIN avatar
BITMAIN@BITMAINtech·Oct 8

📍 BITMAIN at Data Centre World Asia 2026 🔧 Booth centerpiece DCTANK AW1 air-cooling data center container — a prefabricated data center infrastructure for air-cooling computing scenarios: 🔹 20-foot server container + cooling tower unit 🔹 8 racks, 376U of server installation space 🔹 120 kW cooling capacity per unit 🔹 Dry, wet, and hybrid operating modes 🔹 Continuous operation from -35°C to 40°C 🔹 PUE as low as 1.111 🔹 Factory-prefabricated, on-site assembly, rapidly deployable as replicable units 💡 AI-computing convergence: three cooperation models — direct purchase, plug-and-play, and hosting — sharing infrastructure between computing and AI data centers for complementary advantages. BITMAIN remains committed to consistently delivering better products and services to its clients. #BITMAIN #DCTANK #AW1 #DCWA2026 #DataCenter #Prefabricated

Post attachmentPost attachment
BITMAIN avatar
BITMAIN@BITMAINtech·Sep 25

⏰ ANTMINER S23e U2H Limited-Time Special Price — 3-Day Countdown ⚡ 865T hashrate, 10 J/T efficiency. 2U rack-ready, 50% off for a limited time, plug-and-play. 🔧 Covering deployment scenarios from cabinet to container: 🔹 MW-scale mining sites can pair with ANTSPACE HW7 hydro-cooling container 🔹 Smaller-scale sites: pair with ANTRACK AR30/AR31 hydro-cooling cabinets 🔹 Pair with ANTCOLDSTORAGE (ACS) — 8GJ cold storage capacity, supports ambient temperatures up to 55°C, zero operating water consumption. S23e U2H + ACS ensures stable, uninterrupted operation even in hot, water-scarce environments. 💳 Limited-time 50% off: Promotion ends September 27, 2026 🚚 Shipping: November 2026 – January 2027 BITMAIN remains committed to consistently delivering better products and services to its clients. #BITMAIN #ANTMINER #S23eU2H #ACS #ANTSPACE #HW7 #ColdStorage #HydroCooling #50OFF #LimitedTimePromo #Countdown

Post attachment
BITMAIN avatar
BITMAIN@BITMAINtech·Sep 21

🔥 Spot Sale: ANTRACK AR1903 & AR1904 Computing power + heating — all in one. ANTRACK AR1903 hydro-cooling packages ANTRACK AR21 pairs with 4 × ANTMINER S19 XP Hyd., total hashrate 1,028T, power consumption 24 kW, 45°C hot water output. ANTRACK AR21 $2,888/unit + 4 x ANTMINER S19 XP Hyd. $1/T, full package $3,916. ANTRACK AR1904 hydro-cooling packages ANTRACK AR22 Pairs with 4 × ANTMINER S19 XP Hyd., total hashrate 1,028T, power consumption 32 kW, 80°C high-temp hot water output. ANTRACK AR22 $8,888/unit + 4 x ANTMINER S19 XP Hyd. $1/T, full package $9,916. Turn available power into BTC revenue while producing hot water for heating. 🕒 Sales start: September 21 at 9:00 AM (ET) 🚚 Miners ship within 2 weeks · ANTRACK ships within 1 month 📧 antrack@bitmain.com | bitmain.com #BITMAIN #ANTMINER #ANTRACK #AR1903 #AR1904 #HydroCooling #Heating #BTC #SpotSale

Post attachmentPost attachment
BITMAIN avatar
BITMAIN@BITMAINtech·Sep 21

⏰ ANTMINER S23e U2H Limited-Time Special Price — 7-Day Countdown ⚡ 865T hashrate, 10 J/T efficiency. 2U rack-ready, limited-time 50% off , plug-and-play. 🔧 All-in-one deployment with multiple cooling options: 🔹 ANTSPACE HW7 — Next-gen 40ft hydro-cooling container, $169,000/unit, 2MW cooling capacity, holds 242x S23e U2H, PUE as low as 1.031, stable operation from -40°C to 50°C 🔹 ANTRACK AR30 Hydro-Cooling Cabinet — $16,000/unit, connects to existing cooling systems, holds 20x S23e U2H per cabinet 🔹 ANTRACK AR31 Hydro-Cooling System — $20,000/unit, holds 20x S23e U2H, independent dry cooler + heat recovery 💳 Limited-time 50% Off:valid through September, 2026 🚚 Shipping: November 2026 – January 2027 BITMAIN remains committed to consistently delivering better products and services to its clients. #BITMAIN #ANTMINER #ANTRACK #AR30 #AR31 #ANTSPACE #HW7 #HydroCooling #50OFF #LimitedTimePromo #Countdown

Post attachment
BITMAIN avatar
BITMAIN@BITMAINtech·Sep 14

🔥 Spot Sale: ANT COLD STORAGE (ACS) Cold storage solution for high-temperature, water-scarce sites ✨ Store Cold , Stay Online Package Details ✅ • Cold Storage: 8 GJ • Max Ambient: 55°C • Peak Cooling: 6 h/day at 50°C • Water: No operating water consumption • Price: $68,000 /set Ideal for ✅ Standard application:  ➤ ANTSPACE HW7 Fit assessment required:  ➤ ANTSPACE HD5 / HK3  ➤ Liquid-cooled data centers  ➤ Other compatible closed-loop cooling systems 🕒 Sales start on [date/time to confirm] 🚚 Ships within 60 days after full payment 📧 mfspec@bitmain.com | bitmain.com/miningFarmConstr… #BITMAIN #ANTCOLDSTORAGE #NoWaterCooling #MiningFarm #DataCenter

Post attachment
BITMAIN avatar
BITMAIN@BITMAINtech·Sep 11

🔥 Spot Sale: ANTRACK AR31 Hydro-cooling system for ANTMINER ✨ Separate dry cooler · Supports heat recovery Package Details ✅ • Product: ANTRACK AR31 • Capacity: 20 U2H miners • Power: 200 kW • Input: 380–480 V • Rack: 47U • Feature: Separate dry cooler · Supports heat recovery • Price: $20,000 /set Ideal for ✅ • Small mining sites • Mine expansion • Data centers 🕒 Sales start on Thursday, September 10 at 9:00 AM (ET) 🚚 Ships within 45 business days after order placement 📧 antrack@bitmain.com | bitmain.com #BITMAIN #ANTMINER #ANTRACK #AR31 #HydroCooling #SpotSale #HeatRecovery

Post attachment