#BirminghamWeAre, Birmingham's largest and fastest growing promoter of #BirminghamPassion is on a mission to deliver the largest display of community passion for the built environment. #ItsyourBuild is a digital space where #peoplewithpassion can inspire, engage and collaborate.
"Well designed"
"The housing mix is really good"
"This gives confidence to the housing market"
"A major boost to the #Birmingham economy"
4 + 5 Arena Central, across two buildings of 17 + 30 storeys, bringing 526 BTR homes (1-3 beds) + commercial, has today been greenlit, 12-0.
📍 The Hundred, #Birmingham
It's almost time to say cheerio to 100 Broad Street.
A Demolition Management Plan (Condition 17 from approval) has been submitted.
This sets out the methodology & management procedures that will be implemented throughout the demolition phase in Q4.
These plans (2026/05591/PA) have been brought forward by Regal Property Group (dev), Benacre (landowner), shr STUDIO, Exterior Architecture (architects), and CarneySweeney.
A lot of potential for this project (nighttime mock-up from us):
The ground floor will offer active uses: Gymnasium, workspaces, and arrival points, etc.
There will also be a range of lounges and, higher up, shared external garden terraces of differing sizes throughout the stepping of the building:
409 one, two & three-bedrooms.
The scheme will ultimately help re-establish permeability and connections, with the scheme organised around two builds on either side of a central boulevard, with new public routes.
Sightlines to St Martin's Church will be preserved and enhanced:
Mill Lane is a 31 & 16 storey tower scheme proposed for Digbeth, right next to Coach Station.
Architecturally, it's heavily shaped by the site's former 18th-century Slitting Mill and, contemporarily, by Digbeth's regeneration and Smithfield's design code.
👉 409 homes and more.
Remember Kent Street Apartments (133 homes)?
First lodged in '21 and removed from planning committee at the last minute in Nov '24, the site has risen from the dead - aptly, so close to Halloween - and has been APPROVED following a key S106 legal agreement. 👻🎃
⏳
#Birmingham
🐍'The Serpentine Walk' at Arena Central.
APPROVED!
Covered with green plants, grass, and lush vegetation, The Serpentine will snake through the site, bringing new North-South connections and providing a space for residents, workers, and the public to enjoy.
😍 #Birmingham
The new build element will see fire-damaged buildings replaced with a sustainable four-storey aparthotel to the street, complete with two Class E commercial units and a new pedestrian link providing access into a semi-public landscaped piazza.
Site: 173 - 175 High Street
The former Chapel, built in a basilican-Lombardic style with a campanile tower in 1912, will undergo masonry cleaning, removal of unsympathetic additions, and reinstatement of original features.
A new stair in the campanile will also provide access to a viewing platform.
A Grade II listed Chapel in Digbeth is to be renovated & brought back into use again!
Fire-damaged buildings will be removed to deliver a sloped 45-bed aparthotel, designed to bring in natural light & complement the chapel's architecture, while creating a Euro piazza influence.
📣 Digbeth Loc. Studios is the preferred development partner to deliver a major new creative and mixed-use neighbourhood at Fazeley Street in the heart of Digbeth, Birmingham.
✅ It's a a significant step forward in the continued regeneration of Digbeth, helping to strengthen Birmingham’s growing reputation as a national hub for film, television and creative production.
❗The leader of the council said, this is great news and an important milestone in the continued regeneration of Digbeth, one of the most vibrant areas of the city, complementing the work we are already doing across Digbeth to improve the public realm and support its distinctive cultural identity. Digbeth Loc Studios is already playing a huge role in the city’s development as a major filming destination and creative hub.
For more info see link in comments👇