Carter Huddleston@PermitZIPelec·23 Sep 2024

Here's a quick breakdown of the 3 most common types of electrical services: 🔌 120/240V Single Phase: Mostly residential, but can power light commercial spaces like small offices or retail shops. 🔌 120/208V 3 Phase: The go-to for most commercial spaces, suitable for a variety of tenant types. Office, restaurant, brewery, multi-family 🔌 277/480V 3 Phase: A good option for larger buildings (20,000+ sq ft), speciality use, industrial spaces, and locations with high electrical loads. As with anything, the answer on which service works for you is “it depends” but this is a summarized breakdown. Let me know if you have a specific use case and would like some input.

Kenny Shultz avatar
⟳ Carter Huddleston retweeted
Kenny Shultz@PermitZIPhvac·Oct 30

@PermitZIP now has a fully integrated workspace: files, our agent, transcription, PDF markup sessions, live editable documents, and now Mutiny BIM. This is how we'll be prompting construction documents into existence by Q2 2027. We're close to having the contributors we need for Mutiny BIM. We need a few more serious ones, and then we open source the library. Apply here: mutinybim.com

0:48
Carter Huddleston avatar
Carter Huddleston@PermitZIPelec·Sep 3

Here are some of the things an electrical engineer is looking for when they are on a site visit. This is from a recent @PermitZIP site survey in Virginia Beach.

1:55
Carter Huddleston avatar
Carter Huddleston@PermitZIPelec·Sep 3

A look inside the existing electrical service during a recent site survey in Richmond, Virginia. This setup has 3/0 copper conductors feeding a 200A fused disconnect. On the load side, we found two sets of 3/0 copper conductors leaving the disconnect, one feeding the adjacent panel and another running to a separate disconnect. Existing buildings often have electrical systems that have been added to or modified over time. Opening up the equipment and documenting what’s there gives us a much better picture of the existing setup. Need MEP engineering for your next renovation or tenant improvement? Let’s talk. #MEPEngineering #ElectricalEngineering #ElectricalDesign #TenantImprovement #BuildingRenovation #CommercialConstruction

Post attachmentPost attachment
Carter Huddleston avatar
Carter Huddleston@PermitZIPelec·Jun 23

A tenant improvement project at Midlothian, VA. Existing power in the space included a 400A, 480V service feeding a 75 kVA step-down transformer and a 120/208V panel. On paper, it looks like plenty of infrastructure. But after reviewing the client's requirements, most of the existing electrical distribution probably won't be reused. One of the biggest things we evaluate during site surveys is not just what power exists, but whether it actually works for the new use. Need help with MEP engineering for your next tenant improvement or renovation project? Let us know how we can help! #MEPEngineering #ElectricalEngineering #TenantImprovement #CommercialConstruction #BuildingRenovation #ConstructionIndustry

Post attachmentPost attachment
Carter Huddleston avatar
Carter Huddleston@PermitZIPelec·Feb 12

Most electrical issues don’t start in the panel. They start with what you don’t notice in the field. In this episode of Field Notes, we’re on site in D.C., walking a multi-unit building and documenting what’s actually there. 🔻 150A single-phase load centers in each unit 🔻 SER cable leaving the building 🔻 Limited wall space for a meter stack 🔻 Mostly three-wire… but one four-wire plus ground Small differences matter. Three-wire vs four-wire changes how you think about the service. Meter layout changes what’s feasible. Field verification changes everything. If you work in MEP, you already know that existing conditions tell the real story. Take a look at the latest Field Notes episode and see what we found. #ElectricalEngineering #MEPEngineering #CommercialConstruction #ArchitectureAndDesign #MEP #SiteVisit

1:55
Carter Huddleston avatar
Carter Huddleston@PermitZIPelec·Jan 26

Most people walk past an outlet without ever thinking about what’s behind it. But inside that wall is a small decision tree of power, safety, and intent. In this episode of Site Unseen, we step onto an active jobsite and look at: 🔹 What “electrical rough-in” really means 🔹 Why two sets of cables land in one box 🔹 How a simple receptacle fits into a larger circuit 🔹 What’s happening before drywall hides everything If you’ve ever wondered how power actually moves through a building, this one’s for you. #ElectricalEngineering #ConstructionLife #MEPDesign #BuildingSystems #Construction #Engineering #MEP

1:15
Carter Huddleston avatar
Carter Huddleston@PermitZIPelec·26 Dec 2025

Why is this labeled if the directory already exists? ⚡ That small detail often gets ignored. But in the field, it matters more than people think. In this #SiteUnseen episode, we look at a real panel on site and talk through why conductors are sometimes labeled right at the breaker. 🔻 What happens when the dead-front cover is off 🔻 How electricians quickly identify circuits 🔻 Why this helps during maintenance and additions Nothing theoretical. Just what’s actually happening in the field. If you work around electrical systems or design them, this one will feel familiar. Take a look. #Construction #MEP #ElectricalEngineering #MEPEngineering #ConstructionIndustry #ArchitectsAndEngineers

1:18
Carter Huddleston avatar
Carter Huddleston@PermitZIPelec·16 Dec 2025

Yellow, white, orange: what they actually mean. Which gauges match which breaker sizes. And where the NEC draws hard limits on small conductors. Simple concepts. Common mistakes. Real-world context. If you work in residential or multifamily construction, this one is worth a few minutes. #ConstructionEducation #ElectricalContractors #MEPEngineering #BuildingDesign #RealEstateDevelopment #ResidentialConstruction 📘 The discussion in this video ties back to NEC Article 240, specifically 240.4(D) on small conductor overcurrent protection, along with 240.6 for standard breaker sizes.

1:00
Carter Huddleston avatar
Carter Huddleston@PermitZIPelec·8 Dec 2025

Ever wonder what an engineer looks for inside an existing electrical room? ⚡ Out on-site, walking through the transformer, CT cabinet, MDP, and panels. This is the kind of fieldwork that keeps projects accurate and designs grounded in real conditions. A quick look at how we document existing electrical systems before any redesign. 👇 #Engineering #ElectricalEngineering #ConstructionTech #FieldNotes

1:44
Carter Huddleston avatar
Carter Huddleston@PermitZIPelec·21 Nov 2025

Spotted an open-delta high-leg service at an old gas station getting a full upgrade. Two transformers on the pole. 208V to neutral on one phase. Panel marked “high-leg.” Catching this early keeps design clean and avoids costly surprises. ⚡ What field finds have you seen lately? #ElectricalEngineering #Construction #MEP #FieldNotes

1:03