←
Emil Tagesson4 posts
Emil Tagesson avatar

Emil Tagesson

@TagessonEmil

Co-Founder & CTO of Ailit (YC F26) | Replacing diesel in rail with swappable batteries | Ex - Candela, Ex - Koenigsegg

◷ Joined November 2026
Emil Tagesson avatar
Emil Tagesson@TagessonEmil·Nov 14

Overheard a conversation between Claude and one of our engineers: Engineer: "Fan!" (Swedish for fuck) *Brief pause* Engineer: "I ruined the crimp, pick another M5 lug from stock." Easily the best use case for voice AI we've found at Ailit: hands-free commentary whilst building.

Pete Koomen avatar
⟳ Emil Tagesson retweeted
Pete Koomen@koomen·Nov 13

One of the more ambitious teams I'm working with this fall. It turns out batteries are perfect for rail: they're easy to add to existing locomotives, they're much cheaper than diesel, and it takes less time to swap them than it does to change a crew.

Big day for me: @TagessonEmil and I are launching Ailit, swappable batteries for freight trains 🚂🔋 We met at KTH in Stockholm with the same conviction: the future is electric. North American railroads burn ~$15B of diesel a year. But their locomotives already run on electric motors. So we built the world's largest swappable battery packs to power them directly. → Packs ride behind the locomotives railroads already own → Swap in minutes at stops trains already make → Railroads pay per kWh, priced below diesel, nothing upfront We just finished Superwagon, our first full-scale prototype. Next, we roll it out across our energy network. Rail ran on steam. Then on diesel. We're building what comes next. Backed by @ycombinator.

1:56
Christian Lind avatar
⟳ Emil Tagesson retweeted
Christian Lind@christianlind99·Nov 13

Big day for me: @TagessonEmil and I are launching Ailit, swappable batteries for freight trains 🚂🔋 We met at KTH in Stockholm with the same conviction: the future is electric. North American railroads burn ~$15B of diesel a year. But their locomotives already run on electric motors. So we built the world's largest swappable battery packs to power them directly. → Packs ride behind the locomotives railroads already own → Swap in minutes at stops trains already make → Railroads pay per kWh, priced below diesel, nothing upfront We just finished Superwagon, our first full-scale prototype. Next, we roll it out across our energy network. Rail ran on steam. Then on diesel. We're building what comes next. Backed by @ycombinator.

1:56