

✓Large-scale energy storage


Introducing Powercore Solid state medium voltage transformer, inverter and breaker – reliable, safe and secure 7.4 MW/9 MVA continuously at 34.5 kVac w/ grid-forming support for 10MVA of peak power Made in America. Operating 2027


Tesla's Controller-Hardware-In-the-Loop (CHIL) is key to bringing Megapack sites online faster CHIL allows us to simulate the entire site in real time before it’s connected to the grid. We can see how the site will respond to faults, frequency changes or if a tree were to fall on a power line. CHIL validated 444 grid-forming Megapacks at Melbourne Renewable Energy Hub before grid connection, delivering 600 MW / 1.6 GWh of storage months ahead of schedule

Come meet our team at RE+ (booth N726) & learn more about our energy roadmap

Megapack excels in off-grid and on-grid applications, supplying large data center loads, buffering oscillating demand, helping interconnection grid-compliance and strengthening the grid - all with less local fossil generation Megapack is @NVIDIAAIInfra DSX Ready

Australia's first 8-hour long-duration battery is now operating in Limondale, NSW Built by RWE, 144 Tesla Megapacks charge 2x faster than discharge = more daytime renewables stored to cover evening peaks & into the night

Megapack is designed for fast and simple deployment Watch how our products go from factory through installation to get connected to the grid

Megapack 3 is officially rolling off the line at our newest Megafactory in Brookshire, Texas! The factory went from groundbreaking to operation in just 16 months & has a designed capacity of 50 GWh/year dedicated to Megapack 3

Our first Megapacks with Made-in-America LFP cells are on their way to customers! 🇺🇸 These domestic cells are manufactured at our facility in Sparks, Nevada and integrated into Megapacks from our Megafactory in California. This is a significant milestone for domestic cell manufacturing and energy security

Autobidder, our battery optimization service, is maximizing the value of one of France’s largest battery storage projects The Chevire project was developed by @Harmony_Energy_ on the site of a former coal power plant and is providing clean and reliable power to the local area

The first utility-scale Megapack project in New Zealand is now operating! 56 Megapacks at @ContactEnergy Glenbrook-Ohurua Battery 1 are providing 100 MW / 200 MWh of reliable and affordable energy to the region The site was commissioned ahead of schedule and Battery 2 is officially underway

10 GWh of our industrial energy storage products are now operating across Australia! That's equivalent to 160,000 Model Ys. And we're just getting started


Our mission is to build a world of amazing abundance. Highlights from our 2025 Impact Report below Tesla.com/Impact

Last year, 10 of the 17 new utility-scale projects in Australia were Megapack Delivering 4,130 MWh, these accounted for >50% of the total projects reaching commercial operation