←
Transport Action Canada8,215 posts
Transport Action Canada avatar

Transport Action Canada

@TransportAction

Passenger and sustainable public transport advocacy in Canada/Promotion des intérêts aux passagers et amélioration des transports collectifs durables au Canada

◷ Joined January 2010▧ 418 Photos and videos
Transport Action Canada avatar
Transport Action Canada@TransportAction·Jul 23

A stop in the current alignment proposed by Alto, a 25-30 minute drive from Kingston, would likely not have enough ridership to justify the cost and time penalty of stopping as well as just enough to hamper ridership on existing VIA services, putting its future in jeopardy.

Transport Action Canada avatar
Transport Action Canada@TransportAction·Jul 23

Building a high speed rail stop in Kingston should be welcomed, but only if integrated with existing VIA Rail service, otherwise it risks both Alto and VIA. Read more about our letter to Minister MacKinnon here: buff.ly/4gOo7Ug 📸 Nelso Silva (altered) | cc BY-SA

Post attachment
More Transit Southern Ontario avatar
⟳ Transport Action Canada retweeted
More Transit Southern Ontario@moretransitso·Jul 17

Toronto's new LRT lines are significantly faster than when they opened. Line 5 riders are saving 8 minutes on average for trips from Mount Dennis -> Kennedy compared to opening. Finch LRT riders are saving 15 minutes on average for trips from Finch West -> Humber College. 1/2

Post attachment
Stephen Wickens 🇺🇦 🇨🇦 avatar
⟳ Transport Action Canada retweeted
Stephen Wickens 🇺🇦 🇨🇦@StephenWickens1·Jul 9

Better late than never! This link was a key component of a 1969 discussion and a report by the TTC. (57 years ago!). Hat tip to my friend Ed Levy, who contributed so much to lively and intelligent transit discussions in TO over the course of my life.

Post attachment

Crews have cut through walls at Bloor GO/UP and Dundas West TTC stations, making way for an extension to the existing pedestrian tunnel. Once complete, customers will have an accessible and safe underground connection between GO Transit, UP Express and TTC services.

0:25
Transport Action Canada avatar
Transport Action Canada@TransportAction·Jun 22

Building a new route that bypasses the majority of the population between Ottawa and Toronto would be foolish. Any Kingston alignment considered should be well-situated to connect with the current VIA Rail corridor services so that the maximum possible benefits can be realised.

Transport Action Canada avatar
Transport Action Canada@TransportAction·Jun 13

Hurrah! 🎉 The Washington DOT has announced the opening of a pre-clearance facility for passengers at Vancouver's Pacific Central Station— a first ever in North America. Read more to learn just how long this journey has been⤵️ buff.ly/tKv00a0 📸 David Wilson, CC By-SA

Post attachment
Transport Action Canada avatar
Transport Action Canada@TransportAction·Jun 9

Nevertheless, the private sector will always be happy to take public money (with a very high risk-premium attached), but ultimately it ends up being the public that has to both eat the premium and the cost of maintaining service when the model fails. 4/4

Transport Action Canada avatar
Transport Action Canada@TransportAction·Jun 9

something that directly corresponds to ridership. Only government has the ability to properly forecast and control for transportation demand on such long horizons as is needed for large-scale infrastructure projects, therefore only government can reliably take on those risks. 3/4

Transport Action Canada avatar
Transport Action Canada@TransportAction·Jun 9

The assignment of revenue risk to the private sector is one of the primary concerns that we have raised with the #Alto high-speed rail project. Any private sector operator has zero influence over how many people will be living in, say, Peterborough by 2050— 2/4

Transport Action Canada avatar
Transport Action Canada@TransportAction·Jun 9

The International Union of Railways has released a report confirming what we have been saying for years: transferring revenue risk to the private sector simply doesn't work, and the public is left to eat the cost anyway. 🧵 1/4 (Paywall) buff.ly/ne8fOvS

Post attachment