
Join us on October 2nd in Toronto at the Ontario Intercity Travel Summit hosted by @TransportFuture where Transport Action Ontario president Peter Miasek will be speaking alongside many other insightful guests. buff.ly/agta4xA

Passenger and sustainable public transport advocacy in Canada/Promotion des intérêts aux passagers et amélioration des transports collectifs durables au Canada

Join us on October 2nd in Toronto at the Ontario Intercity Travel Summit hosted by @TransportFuture where Transport Action Ontario president Peter Miasek will be speaking alongside many other insightful guests. buff.ly/agta4xA

Funding intercity public transportation is crucial for Canada's social, economic, and environmental goals. Read more about our 2026 federal budget submission here: buff.ly/v8Qmzjd 📸 Courtesy VIA Rail

Want to support our reasoned advocacy? We'd love your help! Become a member today: transportaction.ca/member

A stop in the current alignment proposed by Alto, a 25-30 minute drive from Kingston, would likely not have enough ridership to justify the cost and time penalty of stopping as well as just enough to hamper ridership on existing VIA services, putting its future in jeopardy.

Building a high speed rail stop in Kingston should be welcomed, but only if integrated with existing VIA Rail service, otherwise it risks both Alto and VIA. Read more about our letter to Minister MacKinnon here: buff.ly/4gOo7Ug 📸 Nelso Silva (altered) | cc BY-SA

Toronto's new LRT lines are significantly faster than when they opened. Line 5 riders are saving 8 minutes on average for trips from Mount Dennis -> Kennedy compared to opening. Finch LRT riders are saving 15 minutes on average for trips from Finch West -> Humber College. 1/2

Better late than never! This link was a key component of a 1969 discussion and a report by the TTC. (57 years ago!). Hat tip to my friend Ed Levy, who contributed so much to lively and intelligent transit discussions in TO over the course of my life.
Crews have cut through walls at Bloor GO/UP and Dundas West TTC stations, making way for an extension to the existing pedestrian tunnel. Once complete, customers will have an accessible and safe underground connection between GO Transit, UP Express and TTC services.

Building a new route that bypasses the majority of the population between Ottawa and Toronto would be foolish. Any Kingston alignment considered should be well-situated to connect with the current VIA Rail corridor services so that the maximum possible benefits can be realised.

The federal government has announced that they are seriously considering adding a stop in Kingston to the Alto HSR project. We are very pleased that the government seems to be listening to public and professional feedback. cbc.ca/news/politics/alto-ro…

A better cross-border transportation system comes from sustained advocacy, and we can't do it without your help! Please consider donating to Transport Action today so that we can continue to push for the transportation system we all deserve. transportaction.ca/donate

Hurrah! 🎉 The Washington DOT has announced the opening of a pre-clearance facility for passengers at Vancouver's Pacific Central Station— a first ever in North America. Read more to learn just how long this journey has been⤵️ buff.ly/tKv00a0 📸 David Wilson, CC By-SA

We're working to build our capacity to better advocate for and scrutinize projects like Alto. Become a member today to support our mission the ensure Canadians get the transportation system we deserve. transportaction.ca/member/

Nevertheless, the private sector will always be happy to take public money (with a very high risk-premium attached), but ultimately it ends up being the public that has to both eat the premium and the cost of maintaining service when the model fails. 4/4

something that directly corresponds to ridership. Only government has the ability to properly forecast and control for transportation demand on such long horizons as is needed for large-scale infrastructure projects, therefore only government can reliably take on those risks. 3/4

The assignment of revenue risk to the private sector is one of the primary concerns that we have raised with the #Alto high-speed rail project. Any private sector operator has zero influence over how many people will be living in, say, Peterborough by 2050— 2/4

The International Union of Railways has released a report confirming what we have been saying for years: transferring revenue risk to the private sector simply doesn't work, and the public is left to eat the cost anyway. 🧵 1/4 (Paywall) buff.ly/ne8fOvS