←
Vertiv12,000 posts
Vertiv avatar

Vertiv

@Vertiv

Vertiv is a global leader in critical digital infrastructure. The world depends on data we power and cool™

◷ Joined June 2008▧ 7,023 Photos and videos
Vertiv avatar
Vertiv@Vertiv·19 Dec 2025

AI is changing the rules of infrastructure. Vertiv delivers end-to-end systems—power, cooling, IT, and services—engineered for scale and multiple compute generations ahead. See how we enable uninterrupted performance. Explore more: ms.spr.ly/6010tUBt6 #AIInfrastructure

2:15
Vertiv avatar
Vertiv@Vertiv·1h

We recently welcomed NVIDIA leaders, including Vladamir Troy, to the Vertiv ATLAS Lab for a tour and technical working sessions with Vertiv teams about the evolving power, cooling and controls requirements of accelerated computing. #Vertiv #NVIDIA #AIInfrastructure #Engineering

1:27
Vertiv avatar
Vertiv@Vertiv·Nov 17

Vertiv is expanding its 800 VDC portfolio with new systems for the AI compute pod and data hall, building on the Vertiv™ PowerDirect 5000 Power Rack. Together, the portfolio now addresses three deployment levels: rack, compute pod and data hall. ms.spr.ly/6019xER41

Post attachment
Vertiv avatar
Vertiv@Vertiv·Nov 17

Inside the Vertiv ATLAS Lab, digital modeling, workload emulation and physical system testing come together to help our engineers understand how power, cooling and controls will respond to the demands of current and future accelerated computing architectures. #Vertiv #NVIDIA #AIInfrastructure

2:43
Vertiv avatar
Vertiv@Vertiv·Nov 16

Data center waste heat at 25–35°C could provide 221 TWh/year; 12% of the EU's heating demand. That makes data centers the fourth-largest potential heat source. Learn how the thermal chain can recover this opportunity: ms.spr.ly/6013xBnEb #ThermalChain

Post attachment
Vertiv avatar
Vertiv@Vertiv·Nov 13

AI is driving rack power to new levels, and data center power distribution needs to keep pace. The new Vertiv™ PowerStation 3100 RPP helps meet that challenge, providing 600A to 1,200A of power distribution capacity on a single platform. ms.spr.ly/6017xB9nB

Post attachment
Vertiv avatar
Vertiv@Vertiv·Nov 13

Rack-level 800 VDC wins on 6 of 8 criteria: supply chain, failure containment, installation, operations, regulatory, load flexibility. Facility-level wins on efficiency and throughput. Near-term recommendation: rack-level as stepping stone. ms.spr.ly/6019a46iH #800VDC

Post attachment
Vertiv avatar
Vertiv@Vertiv·Nov 12

The new Vertiv™ PowerNexus MV UPS is an outdoor-rated, medium-voltage power system designed to move critical power infrastructure outside the data hall, helping operators reserve valuable indoor space for compute while supporting evolving grid requirements. Learn more: ms.spr.ly/6017x6Nt1 #UPS

Post attachment