←
Neil Pettinger12,256 posts
Neil Pettinger avatar✓

Neil Pettinger ✓

@kurtstat

Designs learning materials. Drives up and down motorways. Dissects health service data. Delivers training courses. Draws graphs.

◷ Joined December 2008▧ 1,636 Photos and videos
Neil Pettinger avatar
Neil Pettinger@kurtstat·Nov 16

It's so counterintuitive that a 5% reduction in the occupied beds downstream of an ED could lead to a 100% reduction in ED crowding that managers will never believe it.

𒊓𒅂𒁓𒐗𒐕𒐗 Steve the skeptic avatar
⟳ Neil Pettinger retweeted
𒊓𒅂𒁓𒐗𒐕𒐗 Steve the skeptic@sib313·Nov 16

The biggest knowledge gap in the NHS is that the system has no intuition at all about how queues form or behave. This is why waiting lists and A&E crowding seem to be intractable problems...

Neil Pettinger avatar
Neil Pettinger@kurtstat·Nov 13

I can be quite critical of control charts' capacity to falsely reassure us. But when SPC switches to 'process capability' mode, its visual language doesn't pull any punches.

Post attachment
Neil Pettinger avatar
Neil Pettinger@kurtstat·Nov 12

And until we see some improvement in this indicator, we should probably append a thoroughfare-themed label to the blue specification zone, too. It's hard to look at this chart and be lulled into a false sense of complacency now. 12/12

Post attachment
Neil Pettinger avatar
Neil Pettinger@kurtstat·Nov 12

The yawning gap between where we are and where we ought to be should help counter any complacency created by the original design. But to make things really clear, we could add a label to the orange control zone. And we could stick with the lane markings metaphor. 11/12

Post attachment
Neil Pettinger avatar
Neil Pettinger@kurtstat·Nov 12

We want to be able to easily compare the width of our specification zone with the width of our control zone, so let’s colour in the gap between the lower and upper specification limits blue. 10/12

Neil Pettinger avatar
Neil Pettinger@kurtstat·Nov 12

Just as the control limits make it clear that there is and will be week-to-week variability in the metric, so we should accept that there will also be variability if we were ever to achieve target level performance. Let’s create specification limits around our 95% target. 9/12

Post attachment
Neil Pettinger avatar
Neil Pettinger@kurtstat·Nov 12

So far, all the calculated lines on this chart (the centre line and the lane markings) have been derived from the weekly measurements themselves. Nothing 'external' has been imposed on the chart. Let’s change that. There’s a target for this metric. It’s 95%. 8/12

Post attachment
Neil Pettinger avatar
Neil Pettinger@kurtstat·Nov 12

Next, let’s make the area between the upper and lower control limits more visible. Lots of SPC experts argue that the width of the gap between the limits is one of the key visual elements of a control chart, so the orange shading emphasises that nicely. 7/12

Post attachment
Neil Pettinger avatar
Neil Pettinger@kurtstat·Nov 12

Next, let’s do some more re-scaling of the vertical axis. Let’s extend the axis up to 100% since this is the level we’d ideally like this indicator to be achieving. This provides a bit more context. 6/12

Post attachment
Neil Pettinger avatar
Neil Pettinger@kurtstat·Nov 12

First, let’s re-scale the vertical axis so that the bottom of it – as well as the top of it – is truncated. This will help to eliminate any ‘the higher up the vertical axis, the better’ bias . 5/12

Post attachment