←
Therm Tech168 posts
Therm Tech avatar

Therm Tech

@thermtechuk

We design, build and install bespoke industrial waste heat recovery systems with unrivalled technical excellence and through a highly skilled workforce.

◷ Joined December 2014▧ 71 Photos and videos
Therm Tech avatar
Therm Tech@thermtechuk·25 Sep 2019

A ThermTech boiler economiser designed, manufactured and retrofitted to an 8 tonne/hr steam boiler for a textiles manufacturer. The economiser increased the boiler efficiency by 6%. The return on investment period for the project is just over a year. #economiser #boilers #savings

Post attachment
Therm Tech avatar
Therm Tech@thermtechuk·24 Sep 2019

Boiler economisers can achieve a 4-6% saving on fuel costs with return on investment periods of between 6 - 18 months. We can design and install a bespoke economiser system to suit your individual needs. Contact us for a free consultation. #economisers #savings #boiler

Post attachment