Many people are wondering whether Karnataka has really fixed cab fares.
So here's the Feb 2024 notification, which stipulates fares for cabs based on their purchase price.
It's another matter these fares were never enforced. The govt wants to do that now with compulsory meters.
A group of cab drivers stormed Vietnamese ride app @in_greensm's offices in Bengaluru and burnt posters seeking driver applications.
Drivers oppose the firm's entry into Bengaluru, saying it's offering e-cab rides at just ₹8/km while govt fare even for small cabs is ₹24/km.
Departing from earlier practice, Karnataka to allow surge pricing in cabs but cap it at 20%.
The proposed amendments to the Karnataka On-demand Transportation Technology Aggregator Rules, 2016, also mandate meters—to be bought from the market & calibrated by the Legal Met Dept.
First impression of #NammaMetro#PinkLine from my viewpoint
Good things first
- Platforms are accessible easily at Kalena Agrahara
- Travel time reduced drastically to Jayadeva (big boon)
- Access to RV Road platform is easy at Jayadeva
- Optimal AC levels maintained. Purple, Green and Yellow lines are either too cold or too hot.
- Coaches are bright and this will be useful when long UG section start operations
- Nice animation indicating next station - a small train icon (see the video)
- Even with change of lines from Pink>Yellow>Green>Purple, it took me 1.5 hours each side which easily saves close to 1 hour
- In evening, coaches were almost full
Few irritants which need attention
- Footfalls have doubled at Jayadeva & RV. Opening MG Road interchange at the earliest should be a priority to reduce this
- Announcement levels is very low. I did not hear anything properly in last coach.
- Only male voice used instead of male and female voices which is a norm in other lines. Don't know if this will stay as it is
- Tavarekere name still not changed to SG Palya at Kalena Agrahara (check the image)
- Just like Yellow line, doors open after a brief wait
- Acessing Kalena Agrahara platform coming from RV needs walking. Don't know if there's any easy way, which I still need to explore
- Exterior of the trainset is little underdone as rivets can be seen behind black paint. Not sure if it was specified like this in requirement stage
- Finally, no connectivity to MG Road is a big bane for people like us
@OfficialBMRCL@ChristinMP_@ever_pessimist@varungrao
I took the yellow and green line this morning. A good number of commuters, even on an early Saturday morning.
Bangalore desperately needs more lines. People will flock to it despite the last-mile challenges.
Build tunnels if you must, but do it for the metro and not cars.
First-day boardings on the elevated #PinkLine: 33,409
Jayadeva Hospital station sees a 3x rise in boardings: 5,969 → 18,714
Jayadeva Hospital's Pink Line boardings alone: 6,703
If these trends sustain, the line may well see daily average boardings of 50,000!
A first-person account of my ride on the elevated #PinkLine yesterday.
The metro ride helped beat the dread of travelling on Bannerghatta Road.
As an aside, passengers may find it difficult to switch b/w 🟡 & 🩷 lines at Jayadeva.
"They may feel lost, just like at Majestic."
Done with my first ride on the new #PinkLine in Namma metro network.
Kalena Agrahara 6:00
Hulimavu 6:01
Bilekahalli–IIMB 6:03
NS Palya – J.P. Nagar 4th Phase 6:05
Jayadeva Hospital 6:06
S.G. Palya (Suddagunte Palya) 6:08
It took close to 9 min for 7.5km journey, roughly one-third of the time it takes to travel by road on a typical working day.
#NammaMetro Pink Line ops begin Nov 14.
1st trains:
Mon
4.55 am Kalena Agrahara
5 am SG Palya
Tue-Sat: 6 am (both ends)
Sun: 7 am (both ends)
Frequency:
Mon-Fri: 8 mins (peak), 10 mins (off-peak)
Sat-Sun: 10 mins
Last trains:
10.50 pm (Kalena Agrahara)
10.54 pm (SG Palya)
Thrilled to ride the elevated #PinkLine from SG Palya to Kalena Agrahara shortly after its inauguration today.
The 7.5km line opens to the public at 6 am, tomorrow.
@WF_Watcher@blrmetrotracker
The row over who funds #BengaluruMetro may hurt BMRCL.
Sources: "Both parties will play with figures suitable to them. Ultimately, BMRCL will face the music with delayed nods for revised costs, new lines, etc."
Ph 2: ₹40,425cr, ⬆️₹30,695cr
Ph 2A/2B: ₹19,943cr, ⬆️₹14,788cr
The irony is that the IT corridor along the Outer Ring Road drives a massive share of Bengaluru's economy and tax revenue, yet the Blue Line serving it still has no firm opening date. What are you doing? @krishnabgowda@DKShivakumar